Lake Louise update

Great Divide. Photo by Chuck

Chuck skied 36K on cold snow today, covering all the bases at Lake Louise: Moraine Lake road, Upper Tramline and the Great Divide. 

Moraine Lake road. Photo by Chuck

All the above trails are trackset. The fact that Upper Tramline is trackset is significant because Chuck expects the Moraine Lake road parking lot will be closed imminently. You’ll have to park at the lake and ski Tramline for 1.6K to access MLR. Parks Canada is installing an electronic gate to control summer traffic. The parking lot will be opened when construction is completed but Parks Canada is expecting about a two month closure. 

Chuck said it reached a high of -3°C in Lake Louise and he had good grip with VR45(-2/-8). 

Leave a Reply

Your email address will not be published. Required fields are marked *